Home › Glossary
Oil and gas glossary
The words you'll run into on well records, leases and state filings, in plain English.
API number · Completion · Disposal well (SWD) · Drilled but uncompleted (DUC) · Drilling permit (W-1) · Enforcement action · Field · Inactive well · Injection well · Inspection · Lease · Net mineral acres (NMA) · Net revenue interest (NRI) · Operator · Orphaned well · Overriding royalty (ORRI) · P-5 · Plugged well · Royalty interest · SB 1150 15/25 well · Shut-in well · Spud · Temporarily abandoned (TA) · Violation · Working interest (WI)
- API number
- The ID a state gives each well when it is permitted: 2 digits for the state, 3 for the county, 5 for the well, sometimes 4 more for sidetracks and events. It stays with the well for life. How to look one up.
- Completion
- The work that turns a drilled hole into a producing well: setting pipe, perforating the zone and often fracturing it. The completion date on a well record is when the operator reported that work finished.
- Disposal well (SWD)
- A well that pumps produced saltwater back underground for disposal. It needs its own permit. Turn disposal wells on or off with Map layers on the map.
- Drilled but uncompleted (DUC)
- A well that has been drilled but not yet completed. Operators sometimes wait months or years to complete one, waiting on prices, crews or pipeline space.
- Drilling permit (W-1)
- The state's approval to drill. In Texas it is Form W-1 from the Railroad Commission. A permit date on a well record is when it was approved, not when drilling started.
- Enforcement action
- What a regulator does after a violation isn't fixed: a notice, a hearing, a fine, or an order to sever the lease so oil can't be sold until the problem is corrected.
- Field
- The name a regulator gives a producing area or reservoir. One lease can have wells in more than one field when they produce from different zones.
- Inactive well
- A well that is not plugged and has not produced or been used for a while. See the Texas inactive-well screen.
- Injection well
- A well that pumps fluid underground, usually water or gas to push more oil toward nearby wells (enhanced recovery), or saltwater for disposal. Texas records lump the two together on its map layer.
- Inspection
- A regulator's field visit to a well, lease or facility. The inspector records what was checked and whether any rule was broken.
- Lease
- The contract that lets an operator drill and produce minerals it doesn't own, in exchange for a royalty. In Texas well records, "lease" also means the Railroad Commission's lease number, which can cover several wells.
- Net mineral acres (NMA)
- The acres you own minerals under, times your share. Owning half the minerals under 80 acres is 40 net mineral acres.
- Net revenue interest (NRI)
- Your share of the money from production after royalties and other burdens come off the top. A 100% working interest under a 25% royalty is a 75% NRI. Worked example.
- Operator
- The company the state holds responsible for running a well: drilling, producing, reporting and, at the end, plugging it. Every operator on WellheadMap has its own page; search the name or start from a state.
- Orphaned well
- A well with no operator able to plug it, so it falls to the state. Each state decides when a well is orphaned; WellheadMap shows the state's own flag. See plugging.
- Overriding royalty (ORRI)
- A share of production carved out of the working interest, often paid to a landman, geologist or earlier owner. Like a royalty it bears no costs, but it ends when the lease ends.
- P-5
- The Texas Railroad Commission's organization report. Every organization doing work the Commission regulates must keep a current, active P-5 (Statewide Rule 1, 16 TAC 3.1), renewed each year, and is known by its six-digit organization number. You can search WellheadMap by that number.
- Plugged well
- A well sealed with cement plugs so fluids can't move between zones or reach the surface, then reported to the state. Plugged wells stay on record for good.
- Royalty interest
- The mineral owner's share of production under a lease, paid free of drilling and operating costs. Common royalties run from one-eighth to one-quarter.
- SB 1150 15/25 well
- A Texas land well that has been inactive more than 15 years and was completed more than 25 years ago. From September 1, 2027 it must be plugged or brought back unless the Railroad Commission grants an extension. The rules.
- Shut-in well
- A well that can produce but has been closed in, for repairs, low prices or no market. It is not plugged.
- Spud
- The day drilling starts on a well. The spud date is usually weeks to months after the permit and before the completion.
- Temporarily abandoned (TA)
- A well taken out of service with a status the regulator approves, short of plugging. Most states require a test or a plan to keep that status.
- Violation
- A rule broken, as written up by a regulator after an inspection, such as a leak, missing signs, an open pit or an inactive well left unplugged past its deadline.
- Working interest (WI)
- The right to drill and produce on a lease, and the duty to pay for it. If you own 25% of the working interest you pay 25% of the costs and get 25% of what's left after royalties. More.
Guides: How to sell an oil or gas well · Working interest explained · Texas inactive well rules (SB 1150) · What it costs to plug a well · Preparing a well sale package